Page 1 of 1

proLink | Project Checklist - Customer

As preparation for the installation of proLink (Tablet, Support, and IIoT Device), please fill in the following information.

More information about the installation architecture can be found here.

Company - Name

Installation address

Technician - Point of Contact

Please share the name and contact details of the technical person who will accompany the installation of the hardware at your facilities. We suggest a profile with knowledge in maintenance, automation, and/or electricity.

Machine - Name, type of machine, brand, and model

Indicate the name (designation the machine has in the ERP), machine type, and brand (e.g., XR1, press, AIDA).

Installation - IoT Devices

Confirm that the IoT device(s) can be installed inside the electrical panel(s) of the machine(s) to be integrated, that there is space for their installation (70x112x26mm), and that digital electrical signals will be collected from it.

Installation - IoT Devices
A

Information to collect: states and quantity produced

I confirm that the signals to be collected from the machine are related to states (production and stoppage) and quantity produced.
Information to collect: states and quantity produced
A

Installation - Tablet & Support

Validate that you have already selected the location where you want the tablet to be screwed in.

Installation - Tablet & Support
A

Connection - IoT Device<-> Tablet

I confirm that this connection can be made via network cable. If another option is needed, it can be discussed during the kick-off session.

Connection - IoT Device&lt;-&gt; Tablet
A

Connection - Tablet <-> Internet

I confirm that the factory has Wi-Fi to connect the tablet to the internet. If another option is needed, it can be discussed during the kick-off session.
Connection - Tablet &lt;-&gt; Internet
A

Connection: IP - Tablet <-> Internet

Confirmo que a ligação do IP do tablet poderá ser atribuída pela proGrow (dinâmico). Caso necessite de outra opção, poderá ser discutida na sessão de kick-off.
Connection: IP - Tablet &lt;-&gt; Internet
A

Network cables - Length

Please indicate how many meters of network cable are needed to connect the IIoT device to the tablet.

Electrical Panel - Photography

Electrical Panel - Electrical Schematic

Installation Scheduling - Proposed date

The selected dates are not binding. The installation can be managed according to the availability of the team.