Form cover
Page 1 of 1

Residential & Community Developer Review

Is your next project built for the grid of 2030 or 1990?

Grid constraints and EV mandates are stalling projects across Ontario. This 2-minute audit

identifies if your current design strategy is exposing you to connection delays or future

retrofit liabilities.

We thank you for taking the time to complete the assessment.

THE GRID BOTTLENECK

In many parts of Ontario, utilities are delaying project approvals because local substations are at capacity. A "Grid-Interactive" design (using storage) can often bypass these queues by reducing your requested peak load.

What is the current status of your project's grid connection?

THE GRID BOTTLENECK
A
B
C
D

THE EV LIABILITY

Building codes and buyer demand are forcing 100% EV-ready parking. In a multi-unit

building, unmanaged charging can triple your required transformer size—costing you

hundreds of thousands in capital upgrades.

How are you handling EV infrastructure in your design?

THE EV LIABILITY
A
B
C
D

BUYER RESILIENCE PREMIUM

Buyers are increasingly anxious about grid reliability. Homes and condos marketed with "Always-On" backup power

(Microgrids) are commanding a price premium and selling faster than standard units.

Is energy resilience part of your sales pitch?

BUYER RESILIENCE PREMIUM
A
B
C
D

OPEX MODEL

For Condo Boards and Purpose-Built Rentals, electricity is a massive line item. A building

with embedded solar/storage has permanently lower maintenance fees, making your units

more attractive to investors and tenants.

How does your operating schedule align with grid pricing?

OPEX MODEL
A
B
C
D

ROOF MONETIZATION

An empty roof is a wasted revenue stream. With Ontario's Net Metering and the 30% Federal Tax Credit, a roof can generate a 10%+ internal rate of return (IRR) rather than just sitting idle.

What is the plan for the building's roof space?

ROOF MONETIZATION
A
B
C
D

PROJECT SCOPE

To analyze your incentives and load profile, we need a rough idea of the scale.

What type of development is this?

PROJECT SCOPE
A
B
C
D

ASSET VALUE

By 2026, commercial real estate with integrated micro grids (solar/storage) is valued higher because tenants demand cost certainty and green power.

How are you currently utilizing your facility's footprint?

ASSET VALUE
A
B
C
D

DEVELOPMENT PROJECT INFORMATION

Project Description

Please include information about your project (number of units, square feet, phasing, etc.)

Reports, Brochures or Sales Materials

Any materials you can provide to let us understand the scope of your project.

DEVELOPMENT PARTNER INCENTIVES

When is the best time to review the compensation models available for this site?
DEVELOPMENT PARTNER INCENTIVES
A
B
C
D

CONTACT & SATELLITE LOOKUP

First Name

Last Name

Company Name

Your Role

Project Address (Required for Satellite Look-up)


Contact Information

Phone Number

Email